/Docs/G/MacArthur100Change/Criteria/Feasible/0.md
  Source views: Source JSON(ish) on GitHub (VSCode)   Doc views: Document (&k=r00t): Visual Print Technical: OpenParameters Xray
Ti = Feasible
1.Ti = Score
Scale.Bottom = Unrealistic
Scale.Top = Feasible
0.sec = Does the team have the skills, capacity, relationships, and experience to deliver its proposal? Do the budget and project plan represent a realistic understanding of a successful implementation of the solution? Does the proposal outline a mitigation plan for risks associated with changes in key personnel and political, market, or social environments?
1.Score = 0.1-0.9
1.sec = Failed to demonstrate a cohesive team with capabilities to deliver the proposed solution; presented an impractical budget and/or project plan; no mitigation plan for risks.
2.Score = 1.1-1.9
2.sec = Described a team with basic abilities but lacking in knowledge or training; offered an insufficient budget and/or project plan; minimal mitigation planning.
3.Score = 2.1-2.9
3.sec = Proposed a competent, qualified team with clear strengths; presented a realistic budget and project plan with sufficient attention to detail; adequate
mitigation planning. =
4.Score = 3.1-3.9
4.sec = Presented a team of accomplished professionals with a record of success; budget and project plan were detailed, measurable, and cost effective; thorough mitigation planning.
5.Score = 4.1-5.0
5.sec = Led by an experienced team of qualified experts who have achieved remarkable results; budget and project plan grounded in past success; comprehensive mitigation planning.
= [G/MacArthur100Change/Widget/CriteriaTable.md]